stusgo 5 PCS Double Decker Fruit Storage Containers for Fridge No BPA, food-grade freezer-sealed drained fruit containers for fridge keep fruit fresh for long periods of time and are machine washable

$29.99
  • Brands stusgo
  • Product Code: BXBXHe-5
  • Availability: 998

Product details

Why choose our fruit storage containers for fridge?

1.This produce containers for fridge is made of PP food grade material, which does not contain any toxic ingredients, bringing you a safer and more secure experience.

2.The rubber sealing ring of the fridge fruit storage containers can make your food completely insulated from air, realizing true vacuum storage for 24 hours, preserving the freshness of your food for a longer period of time.

3.The fresh produce containers for fridge can be placed in the refrigerator for freezing, the lowest temperature can withstand -20°, bring you a cool summer food experience.

Fruit and veggie storage containers are simple and convenient to use, just put fruits and vegetables into the container to receive water to soak, wash, and then use the draining basket to drain the water, sealed storage can be, a series of processes in one go.

 

  • 5 Star
    0%
  • 4 Star
    0%
  • 3 Star
    0%
  • 2 Star
    0%
  • 1 Star
    0%


Inquiry

Please submit your complete information for more information and contact!